久久精品二区亚洲w码_懂色av字幕在线_欧美一区三区在线观看_97久久国产亚洲精品超碰热_国产精品54页_久久久久成亚洲国产av综合精品

NewsHome > News > Company news

Significance of continuous slipform paving for bridge deck curb stone slipform paver
release time:2020-3-21 15:33:07      hit count:2235

   With the speeding up of highway construction in China, the paving technology of cement concrete pavement slipform machinery-curbstone slipform paver has been widely promoted and applied, and more and more large, large, medium and small bridges, overpasses, The technical problems of mechanized pavement of single-double-layer reinforced concrete bridge (culvert) surfaces of passages, culverts, and bridgeheads need to be solved through research and engineering practice.

93ab75558c0586a545d12cac6dae8d7.jpg

   Due to the high overall smoothness and durability required of highways, technically, cement concrete pavements, reinforced concrete bridge decks, and reinforced concrete decks at bridge heads are required to achieve continuous paving by curbstone slipform pavers. In order to improve the overall smoothness of the cement concrete pavement, the pavement of extra large, large, medium and small bridges, culverts and passages is paved with curbstone slipform paver when the pavement is slipped. In this way, a high-density, high-flatness bridge deck with the same quality as a slipform paving cement concrete pavement can be obtained. When a motor vehicle runs through these continuously paved bridges (culverts) at high speeds, it is not felt that they are passing through the bridges and culverts, and there is no bumping vibration bumps and no need to decelerate.

   Along the highways in China, due to the large population and dense villages, except for some remote provinces and regions, on average there are more than 3 bridges and culverts and passages per kilometer of highways. If we use the curbstone slipformer for mechanized construction, we can only pave the pavement, and we cannot continuously pave the reinforced concrete bridge deck. The bridge (culvert) surface and the slab are manually constructed, which will inevitably cause slipform machinery that will seriously affect the cement concrete pavement The speed of construction prevents the benefits of large slipform machinery from being fully utilized. On the other hand, the construction quality and overall flatness of the bridge and culvert pavement on the expressway are reduced.

   Objectively, highways, regardless of the cement concrete pavement and reinforced concrete bridge deck, must use curbstone slipform to talk about the pavement mechanized pavement construction technology to ensure its construction quality. Otherwise, the manual construction method will continue to be used. Under such a strong destructive force on the highway, the bridge deck pavement layer cannot be resisted, and serious damage may occur 3 to 5 years after opening to traffic. Currently, rigid bridge deck pavement Repair of the coating is quite difficult.


Previous: Omnidirectional concrete curbstone slipform paver-New curb NC1300
Next: Welcome Minister Xu Donghai and his party to visit our company to inspect and guide our work

Back to list

News you are interested in
主站蜘蛛池模板: 平乡县| 石景山区| 师宗县| 页游| 繁昌县| 道真| 富顺县| 大关县| 博爱县| 如皋市| 巨鹿县| 阳城县| 罗田县| 临夏县| 陵川县| 朔州市| 屯门区| 竹北市| 海南省| 广元市| 永年县| 台中市| 南阳市| 深水埗区| 怀化市| 张家口市| 镇康县| 栖霞市| 大城县| 罗定市| 伽师县| 高青县| 苍山县| 洪洞县| 锡林浩特市| 南木林县| 新乐市| 彩票| 封开县| 泗水县| 石河子市|